Skip to main content

2027 CCR Deadline: 39 days away — Publish your compliant CCR here for free →

Water operator for CAMP LONG LEADERSHIP CENTER (0270678)? Claim this free listing and publish your 2026 CCR where your customers are already looking. Claim Free →

PUBLIC WATER SYSTEM REPORT

Is CAMP LONG LEADERSHIP CENTER (0270678) Water Safe to Drink in 2026?

South Carolina · PWSID SC0270678 · Ground water

Population served
175
Cities served
AIKEN
State / jurisdiction
South Carolina (SC)
PWSID
SC0270678
—
TAP WATER GRADE
Monitoring coverage incomplete
Model score 0/88 from violations, PFAS profile, and monitoring signals — not a laboratory test of your faucet.
20 violation record(s) in the latest EPA SDWA quarterly snapshot
CONTAMINANTS — EPA UCMR5 MONITORING

No UCMR5 PFAS detects on file for this PWS in our bundled national dataset — the system may be smaller than UCMR5 thresholds, had non-detects, or results are not yet linked to this ID. Your retailer Annual Water Quality Report lists other regulated contaminants (chlorine, DBPs, nitrates, etc.).

Official Consumer Confidence Report (CCR)

The official 2026 CCR for CAMP LONG LEADERSHIP CENTER (0270678) has not yet been published on WaterCheckup.

Are you the water operator for CAMP LONG LEADERSHIP CENTER (0270678)? Publish your official CCR here for free — your customers are already finding this page.

Claim This Listing Free →

Residents: Your public water system is required by EPA to publish an annual CCR by July 1st each year. Contact CAMP LONG LEADERSHIP CENTER (0270678) directly to request a copy, or check the EPA's national CCR portal at cfpub.epa.gov/ccr.

VIOLATIONS HISTORY (FEDERAL SNAPSHOT)

EPA’s national SDWA quarterly files associate 20 violation-related records with this system in the same reporting quarter as the public water system snapshot used on WaterCheckup. This is not a complete historical docket — see ECHO and SDWIS for full compliance context.

Get the general weekly water treatment newsletter:
WHAT TO DO ABOUT IT

Based on CAMP LONG LEADERSHIP CENTER (0270678)'s monitoring and violation profile, here are vetted filtration options — same picks framework as our city reports.

Clean water splash — certified water filter recommendations

Certified Filter Recommendations

Matched to what's actually in your water

Affiliate disclosure: some filter links are affiliate links. If you buy through them, WaterCheckup may earn a commission at no extra cost to you. As an Amazon Associate I earn from qualifying purchases. Compare the exact model’s published reduction claims before you buy.

TOP PICKS FOR CAMP LONG LEADERSHIP CENTER (0270678)
⚠ EPA violations / contaminants in monitoring data
#1
Waterdrop G3P600 RO
EDITORS PICK
Waterdrop  ·  ~$399
Tankless 600 GPD, removes 99%+ PFAS & lead, 10-stage filtration. Smart faucet TDS display.
WHY THIS FOR CAMP LONG LEADERSHIP CENTER (0270678) · Chosen for CAMP LONG LEADERSHIP CENTER (0270678) because the latest federal SDWA snapshot lists substantial violation activity. Certified reverse osmosis provides the broadest residential barrier for households that want margin beyond legal compliance.
#2
Frizzlife SK99-NEW
DIRECT-CONNECT CARBON
Frizzlife  ·  Check current price
Direct-connect carbon filtration for municipal cold water. Uses the existing faucet; no RO drain or electrical outlet. Does not reduce dissolved salts or soften water. Verify the exact cartridge’s listed reduction claims.
#3
Epic Smart Shield
DIRECT-CONNECT CARBON
Epic Water Filters  ·  Check current price
Carbon-block under-sink filter connecting to the existing cold-water line. No RO drain or dedicated faucet. Not reverse osmosis or a softener; check the exact model’s performance data for your concern.
Not sure which filter is right for you? Take the 3-question quiz →
See all public water systems in South Carolina →
STAY INFORMED
Weekly water treatment newsletter

Practical guidance on water testing, filtration, and maintenance. One general email per week; this does not monitor local emergencies.

Check your ZIP code

PWS-wide data may differ from the system serving your home. Enter your ZIP on the homepage for a tailored EPA report.

Fix My Water — Free →